Projects
28 Results
-
UCSD Hillcrest Medical Campus Redevelopment – (read more)
DBC designed, modeled, fabricated, and installed 156 X-Series sheathed panels for two exterior stair tower cores.
-
Hyatt Regency Conroe Hotel & Convention Center – (read more)
DBC prefabricated 3,032 load-bearing CFS panels to create the building's structure, skin, and wall framing.
-
Flat Creek Apartments – (read more)
DBC prefabricated 880 panels of walls and decks to create the building's structure.
-
10x Genomics Biotech Facility – (read more)
To achieve the highest quality, DBC constructed a two-story mockup of prefabricated EIFS panels and punched windows for water pressure testing.
-
UC Davis Health 48X Complex – (read more)
390 prefabricated panels were designed and manufactured to meet the seismic requirements for the state of California.
-
Meridian | Medical Office Building – (read more)
The award-winning design feature of the project is the 60-foot-long, 2-foot cantilevered "eyebrow" framing integrated into the CFS panels.
-
San Francisco State University Science & Engineering Center – (read more)
42,000-sq.-ft. of sheathed exterior panels were installed in only 13 days, averaging 12 panels per day.
-
AC Hotel Scottsdale North – (read more)
Prefabricated structural wall system saved the GC 10-12 weeks on their schedule, allowing MEP trades to start earlier than a traditional construction approach.
-
Brownwood Hotel & Spa – (read more)
DBC’s prefabricated sheathed exterior wall panels were wrapped in a façade of alternating EIFS and brick and topped with aged bronze-finished metal roof to match the desired aesthetic.